Northern Road Stage 5 and 6
CPB
Luddenham, NSW
Scope of Work
Slipform lean mix pavement.
- Slipform of lean mix using multilane paver
- Slipform of lean mix using Single lane paver
- Slipform of kerb
- Insitu pouring of concrete driveways and pavement
- Installation of precast lintels
Highlights
Slip forming of speciality designed concrete for the first time and addition of a vibrating beam on paver for finishing.
Timeline
March 2020 – ongoing


Project Highlights
Slip forming of speciality designed concrete for the first time and addition of a vibrating beam on paver for finishing
70000
m3 of Concrete
5000
lineal Metres of kerb works
3000