Northern Road Stage 5 and 6

CPB

Luddenham, NSW

Scope of Work

Slipform lean mix pavement.

  • Slipform of lean mix using multilane paver
  • Slipform of lean mix using Single lane paver
  • Slipform of kerb
  • Insitu pouring of concrete driveways and pavement
  • Installation of precast lintels

Highlights

Slip forming of speciality designed concrete for the first time and addition of a vibrating beam on paver for finishing.

Timeline

March 2020 – ongoing

Project Highlights

Slip forming of speciality designed concrete for the first time and addition of a vibrating beam on paver for finishing

70000
m3 of Concrete
5000
lineal Metres of kerb works
3000
m2 of driveways