Concrete Services
As part of the landmark development of Western Sydney International Airport, the Aerowest Joint Venture, comprising Seymour Whyte and BMD, was awarded the contract to deliver landside infrastructure works. Dowsing was engaged to support this transformative project by delivering kerb and gutter works, along with No Fines Concrete (NFC) placement, across a 16-kilometre stretch of the airport precinct.

The new airport is a cornerstone of Australia’s infrastructure future, designed to accommodate millions of passengers annually and serve as a catalyst for economic growth in Western Sydney.

Client

Seymour Whyte & BMD (Aerowest JV)

Sector

Infrastructure

Project Type

Roadworks - Kerbing

Location

Sydney, NSW

Duration

Nov 2023 - Dec 2024

Type

Construct Only

Dowsing Group’s scope of works included:

  • Slipform kerb installation for high-volume, consistent output along major access roads.
  • Extruded kerb and gutter works to suit varying design profiles and drainage requirements.
  • Hand-poured kerb and gutter sections for complex or constrained areas requiring precision.
  • No Fines Concrete (NFC) placement to support subsoil drainage and structural integrity.

Key Outcomes

Dowsing’s contribution supported the successful delivery of critical landside infrastructure, helping lay the foundation for one of Australia’s most ambitious transport projects. Key outcomes include:

  • Durable and compliant kerb and gutter systems across 16km of airport infrastructure.
  • Effective drainage solutions using NFC to support long-term pavement performance.
  • Integration with broader transport links including the M12 Motorway and Sydney Metro.

The Western Sydney International Airport is expected to generate tens of thousands of jobs and become a major gateway to Australia. Dowsing is proud to have played a role in shaping this future-ready transport hub.

Challenges & Solutions

Operating within a high-profile, multi-contractor environment required strict adherence to safety, quality, and scheduling protocols. Dowsing coordinated closely with Seymour Whyte and BMD to ensure seamless integration of kerb and drainage infrastructure with broader landside works, including car parks, access roads, and transport hubs.

The site’s evolving topography and tight program deadlines demanded flexibility in construction methods. Dowsing adapted its approach balancing machine-laid and manual techniques to maintain progress and meet quality benchmarks.