The Central section, delivered by Seymour Whyte on behalf of Transport for NSW, includes major earthworks, bridge structures, and complex pavement construction through the centre of the corridor.
Dowsing Group was engaged to deliver large-scale diamond grinding and grooving treatments across the project’s pavement to achieve the required surface smoothness and ride quality.
Client
Sector
Project Type
Location
Duration
Type
Dowsing’s scope included conventional and flush diamond grinding, grooving, and feather grinding, all performed using calibrated grinding equipment with automated controls to achieve tight ride quality tolerances.
- 90,000m² conventional diamond grinding
- 90,000m² flush diamond grinding
- 103,000m² grooving
- 6km feather grinding
- Individual scope tracking to support accurate programming and delivery
Dowsing successfully completed extensive diamond grinding and grooving works across the M12 Motorway Central section, contributing to the delivery of a high-performance pavement surface. The program achieved an average International Roughness Index (IRI) of 1.1, with some sections recording IRI values as low as 0.3 — an exceptional result for large-scale motorway construction.
Through daily pre-start coordination, calibrated machinery, and rigorous safety and quality management, Dowsing ensured all works were completed efficiently, safely, and to specification. The collaboration with Seymour Whyte exemplified best-practice delivery, resulting in a durable, smooth, and compliant pavement finish that supports the long-term performance of this critical transport corridor