The works expanded interchange capacity, improved accessibility and upgraded supporting infrastructure within a live public transport environment, ensuring safe, efficient and reliable operation of train replacement bus services.
The works were undertaken within an active train station precinct with high pedestrian movements and constrained work zones. Dowsing implemented staged construction sequencing, temporary fencing and traffic control measures to maintain safety and access while delivering works efficiently.
Client
Sector
Project Type
Location
Duration
Contract Type
The contract scope of works includes the following activities:
- Preparation and approval of Traffic Management and Noise Management Plans.
- Demolition and removal of existing kerbing, asphalt, concrete slabs, line marking, wheel stops, signage and redundant infrastructure.
- Excavation and preparation of bus stop and hardstand areas.
- Profiling of existing asphalt pavements to 50mm depth.
- Construction of pavement layers, including 150mm crushed limestone subbase and crushed rock basecourse.
- Application of prime seal and sprayed asphalt surfacing, including 40mm DGA (14mm aggregate).
- Construction of standard and semi-mountable barrier kerbing.
- Construction of concrete slab works, including 32MPa slabs, shelter footings, mesh reinforcement and vacuum excavation.
- Installation of tactile ground surface indicators (TGSI) and drainage plate covers within hardstand areas.
- Line marking to approved layouts and PTA standards.
All activities were completed in accordance with PTA specifications and accessibility requirements, ensuring programme certainty and operational continuity