As the main civil contractor, Dowsing is responsible for constructing a new signalised entry from South Street and modernising the shopping centre’s entrances and exits along the East and West carriageways.
This transformative project involves overhauling existing infrastructure, creating new turning pockets, and installing advanced traffic signal systems to accommodate increased traffic demand. These upgrades aim to reduce congestion, improve safety, and support the ongoing growth of the shopping centre, ensuring a seamless experience for shoppers and commuters alike.
Client
Sector
Location
Duration
Type
The comprehensive scope of works highlights Dowsing’s expertise in delivering complex infrastructure projects and includes:
- Removal of existing services, current drainage, electrical and utility services along the existing entrances.
- New stormwater drainage installation.
- Profiling, subgrade preparation and box out. foundational works for new construction works.
- Construction of new turning pockets for both entering and existing the shopping centre.
- Construction of new concrete kerbs and footpaths.
- Installation of traffic signals.
- All works complete to MRWA specification.
Dowsing efficiently managed Stage 1 of the project within an active shopping centre, prioritising safety, quality, and minimal disruption. By strategically staging works and scheduling major tasks at night, we ensured seamless daytime operations while maintaining a safe environment for shoppers, staff, and workers.
Latest Projects
Looking for the next step in your civil construction career?
At Dowsing Group, we’re shaping the infrastructure that connects communities. Join our team of skilled professionals and help contribute to local civil projects that leave a lasting impact.



