Dowsing successfully delivers a comprehensive Principal Shared Path (PSP) construction program designed to improve active transport and connectivity throughout the City. Recent projects span asphalt PSP works across four key corridors: Koondoola Avenue to Beach Road, Hartman Drive, Yellagonga Regional Park, and Alexander Drive. These strategic links enhance pedestrian and cyclist access to schools, parks, and regional shared path networks.
Client
Sector
Location
Duration
Type
The contract scope of works included the following deliverables:
- Comprehensive site clearing and preparation works.
- Site clearing, demolition, and excavation of existing pavement and verges.
- Aboriginal monitoring at Yellagonga PSP via Whadjuk Aboriginal Corporation (WAC).
- Underground utility location, protection, and potholing.
- Subgrade preparation and compaction testing (18 lots on Koondoola alone).
- Limestone subbase boxing out and basecourse installation (7,000m² Koondoola).
- Prime seal and red asphalt pavement construction.
- Upgrading trafficable manholes and installing new pram ramps.
- Verge shaping, backfilling, and reinstatement to match existing levels.
- Brick paving infill, pedestrian crossing upgrades, and concrete footpath works.
- Kerbing, tactile indicators, and landscaping reinstatement.
- Full-service traffic management across multiple live-road environments.
- Integration of new infrastructure with existing road and pathway networks


Latest Projects
Looking for the next step in your civil construction career?
At Dowsing Group, we’re shaping the infrastructure that connects communities. Join our team of skilled professionals and help contribute to local civil projects that leave a lasting impact.